Anna Ferris - 10418 S Ferris Ln, Coeur d'Alene
Standing-seam re-roof, 24ga vs 22ga. This page updates in place as the build progresses - refresh to see the latest.
Reconciled pricing - foam split out as the optional upgrade (final seed, 2026-08-24)
| Scope | 24 gauge | 22 gauge | |
|---|---|---|---|
| Main residence, base (1,472 sqft, Roofr) | $78,656.08 | $91,156.08 | |
| + Optional rigid foam board upgrade (main) | $30,244 | ||
| Main with upgrade = engine total | $108,900 | $121,400 | |
| Alternate A - both detached roofs, base | $21,988.23 | $25,288.23 | |
| + Optional foam upgrade (detached, materials only) | $7,212 | ||
| Alternate A with upgrade = engine total | $29,200 | $32,500 | |
| Alternate B - chimney counterflashing | $1,950 | ||
| Gutters | unpriced - provenance gate open | ||
Every base + checked upgrade reconciles to the engine totals EXACTLY (22-check verify battery, adversarially recomputed from the written payload). The upgrade carries what the engine itself allocated to foam: board, heavy fasteners, slip sheet, custom-depth trim uplift, 4 man-days on the main. Honesty note: the engine prices detached-roof labor as flat man-days with no foam allocation, so the detached upgrade is materials-only. Proxy flags unchanged: foam $4.00/sqft DERIVED-PROXY (no product ever selected - your pick); ASC 24ga panel basis dated 2026-03-17. One checkbox drives both scopes in the editor.
Documents
Proposal v5 PDF (current) Internal pricing provenance Pricing editor Discovery synthesis - found / missing / open FERRIS-JOB-MODEL - the grounded picture (correct me)The editor and the new proposal pages are being ported from the Revis editor-first workflow: additive line-item pricing, keyless cross-device autosave, jurisdiction-computed permit fee (Kootenai County), labor-model knobs, and gate-checked rendering. Each deploy replaces this page at the same URL.
Build status (updated 2026-08-24 ~1:00 PM)
- PORT BUILD RUNNING - the Revis v5 chain is being snapshotted into the Ferris repo (branch editor-port) right now: scripts adapted, Kootenai permit wired, keyless autosave wired, job-model gate wired into the render gates. Every commit pushes.
- Terminology audit CLOSED - 17 correction rows, all 5 model-dependent rows resolved against the job model. In the repo: model/TERMINOLOGY-AUDIT.md. The Taylor/Western States "alternates" sentence gets deleted outright - Anna asked the supplier question herself, so an unowned line naming Taylor would read as a vetted answer nobody gave.
- Style authority EXTRACTED - all six sent PDFs (West, Kelley, Collins v21, 2321 garage, Hughes, Thurman) located and read in full. Locked terminology, section skeleton, color-page pattern, voice. Terms language: the June generation (mediation, no late fees, deposit applied) is current; April arbitration wording superseded. In the repo: model/SENT-PROPOSAL-STYLE-AUTHORITY.md.
- Rigid foam board = OPTIONAL UPGRADE (unvented; no product ever selected - selection stays open for you). Slip sheet, custom-depth trim, heavy fasteners, +4 man-days leave base with it. Reconciled base numbers post here when the seed rebuild lands (finishing now).
- Colors + visualizers restored - four AEP directions (Cool Matte Black, Dark Bronze, Slate Gray, Weathered Copper) + the four committed renders, presented per-option per your sent-proposal pattern.
- Permit: Kootenai County computed $376 ($235 re-roof + $141 application, Res 2026-62). Phone: 208-508-ROOF everywhere; the old number is on the gate's banned list.